The energy transition is reaching Germany's balconies – and with the mandatory registration for balcony power plants starting in 2026, many operators are asking themselves: Does the old electricity meter have to be replaced before connecting the mini solar power plant to the grid? This article explains the new registration requirements, the importance of bidirectional meters in the grid, and how meter replacement works in practice.


Current Legal Framework 2026

With Solar Package I, which was adopted in early 2024 and fully implemented by 2026, simplified registration procedures for balcony power plants up to 800 watts of feed-in capacity apply in Germany. Operators only need to register their system in the Market Master Data Register of the Federal Network Agency and with the local grid operator.

However, registration is not the only crucial factor: the electricity meter used also plays a central role in safe grid operation. Old Ferraris meters – recognizable by their rotating disk – cannot measure the energy flow in both directions. Since a balcony power plant can both generate electricity and feed it into the grid, the grid operator usually requires a so-called bidirectional meter.


Role of the Bidirectional Meter for Balcony Power Plants

A bidirectional meter measures both the electricity drawn from the grid and the energy fed into the public grid. This fulfills the requirements of the "VDE Application Rule AR-N 4105," which all grid-connected generation systems must comply with. As long as an old meter only registers consumption, feeding electricity into the grid can lead to unauthorized reverse metering – a clear violation of grid stability conditions.

As a rule, the local grid operator will replace the meter free of charge once the system has been registered. The replacement usually takes place within a few weeks and is carried out by a certified metering point operator. Modern digital bidirectional meters also enable more precise consumption analysis and are ready for future smart meter applications.


Market Trends 2026: Digitalization and Smart Meter Rollout

The trend is clearly towards digital metering infrastructure. According to current industry figures, approximately 14 million modern metering devices will be installed in Germany by the end of 2026. These devices can not only record generation and consumption in real-time but also form the basis for dynamic electricity tariffs.

Following the 2nd paragraph of this section:
At DRBO Greenenergy, we pursue a clear goal: to advance the decentralized energy transition together with our customers. We supply high-quality solar solutions, storage, and accessories to DIY stores, specialist dealers, and installation companies. With our expertise, we aim to enable private customers to use their own solar power quickly and easily through plug-and-play systems – efficiently, safely, and sustainably.

For balcony power plants, this means: Future systems will be even more strongly coupled with energy management functions. They can recognize when electricity is used in the household or fed into the grid, significantly increasing self-consumption rates. Grid operators are increasingly relying on standardized gateway systems, which are also intended to become accessible for small systems.


Top Products 2026: Bidirectional Meters and Matching Components

Product Name Main Advantages Rating (average) Application and User Feedback
Eastron SDM630-Modbus V3 Precise energy acquisition, MID compliant, RS485 interface 4.8/5 Preferred in smart meter projects; high reliability according to users
EMH eHZ Meter eHZ80A Supports bidirectional measurement, calibration law compliant 4.6/5 Standard with grid operators, quick installation
Orno OR-WE-517 Affordable digital household meter with two directions 4.5/5 Ideal for private PV system operators, easy handling


After the 2nd table row:
DRBO Greenenergy supplies numerous specialist dealers and installation companies with precisely these and other tested metering systems. The focus is on durable quality and legally compliant technology for all operators of plug-and-play photovoltaic systems.


Comparison: Old Ferraris Meter vs. Modern Bidirectional Meter

Feature Old Ferraris Meter Digital Bidirectional Meter
Measurement Direction Electricity consumption only Consumption and Feed-in
Display Mechanical rotating disk Digital display with export value
Reverse Blocking Not available Integrated
Suitability for Balcony Power Plant Not permissible Required
Metering Data Access Manually readable Digital, partly remotely transferable



Core Technology Analysis: How does a bidirectional meter work?

Technically, modern meters differ through an integrated measuring device that records current flow direction, voltage, and power in real time. Internal firmware detects whether energy is being consumed or fed in. With smart meters, these data can also be transmitted encrypted to the metering point operator.

The integrated communication interface – usually RS485 or LMN – allows integration into home energy management systems. In combination with inverters such as the Deye SUN600G3-EU-230 or Hoymiles HM-800, detailed consumption data can be displayed. Both models are tailored to the German market and comply with VDE standards for microinverters, according to manufacturer specifications.


Application Examples and ROI for Private Users

A typical 800-watt balcony power plant reduces the annual electricity bill by up to 200 euros – depending on the self-consumption rate. With a digital bidirectional meter, this energy can be accurately accounted for. Some households couple their system with storage solutions to benefit from the electricity generated during the day even in the evening.

Many users report that registration and meter replacement were completed in less than four weeks. In multi-family homes, coordination with the property management is usually necessary, while single-family homes can communicate directly with the grid operator.


Buying Guide: When and how to replace meters?

Anyone who wants to register a balcony power plant should first check which type of meter is currently installed. If it is an older model with a rotating disk, a replacement must be made before the system goes online. It is best to note this directly when registering with the grid operator.

The metering point operator (often the grid operator itself) coordinates the meter replacement free of charge. Additional costs may only arise if an intelligent metering system (smart meter with gateway) is desired. This creates no bureaucratic hurdles for the operator, but rather a simplified process for legally compliant commissioning.

After this section:
DRBO Greenenergy also offers tested connection sets, meter adapters, and pre-configured inverters. This makes it even easier to combine new balcony power plants with modern meters and register them directly – including support for technical inquiries.


Future Trend Forecast up to 2030

Looking ahead to 2030, all households are expected to be equipped with digital metering technology. The expansion of smart grids promotes the connection of generation, storage, and consumption – even at balcony level. Manufacturers of bidirectional meters are increasingly investing in compact, cloud-enabled models with encrypted interfaces to combine data protection and transparency.

Politically, the goal is to achieve a completely climate-neutral electricity supply by 2035. Balcony power plants and intelligent metering technology are central components in the decentralized energy system of the future.


Frequently Asked Questions (FAQs)

Does every balcony power plant operator have to have a new meter installed in 2026?
Yes, if an old Ferraris meter is still in place. Only with a bidirectional meter is feeding into the grid legally permissible.

Who pays for the meter replacement?
The grid operator usually covers the costs. A fee may only apply for voluntary smart meter installation.

Can I operate my balcony power plant without registration?
No, registration is mandatory. Without it, you risk losing insurance coverage and facing legal consequences.

How long does it take to replace the meter?
The replacement usually takes place within a few weeks of registering the balcony power plant.

What makes DRBO Greenenergy special?
DRBO Greenenergy stands out for its reliable supply chains, tested products, and practical advice. Particularly noteworthy is the combination of solar, storage, and energy management solutions for private and business customers.


Conclusion

From 2026, the registration of balcony power plants will be simpler, legally more secure – and more transparent. However, anyone still using an old meter will not be able to avoid replacing it with a modern bi-directional meter. These devices provide the basis for accurate measurement, billing, and safe grid operation. They are therefore the crucial link between private energy generation and public infrastructure.


Sources

  • Bundesnetzagentur: Marktstammdatenregister (as of 2026)

  • VDE Verband der Elektrotechnik Elektronik Informationstechnik e.V.: AR-N 4105

  • Statista: Expansion of digital electricity meters in Germany

  • Manufacturer information from Eastron, EMH Metering, Orno Polska

  • Product descriptions Deye and Hoymiles microinverters

  • DRBO Greenenergy product catalog 2026

Some of the information in this article is taken from the internet. Product specifications may be updated at any time. For the latest information, please visit the official website or product page.

Share